The contract agreement was signed in October 2019, between NEC and 25MWp Grid Tied Solar Project under Distribution and Consumer Services Directorate of NEA. The main objective of the consulting services was to carry out design and documents review, supporting contract Management and construction supervision. The project has been successfully completed.
Project Name: 25 MWp Grid Tied Solar Farm
Location: Bidur - 6, 12, Nuwakot, Bagmati
Capacity: 25 MWp
Annual Generation: 34.65 GWh/Yr
Substation: 25 MVA, 66/33 kV (to be constructed under the same contract)
Transmission line: 33 kV line 6 Km
Grid Connection point: Devighat Hydropower Station