The contract agreement was signed in December 2020 between NEC and Jagdulla Hydropower Company Limited to conduct the Feasibility/Detail Engineering Study of JAHEP incorporating the technical, financial, and relevant aspects of the project development based on detailed survey and investigations including preparation of Bidding documents of the project. The Feasibility Report of this Project was submitted in September 2024. The study phase of the Project is scheduled to be completed by February 2025.
Location: Dolpa and Jajarkot Districts, Karnali Province
Type of Project: Peaking Run of River
Design Discharge: 30.6 m3/s
Gross Head: 475.3m
Installed Capacity: 124.3 MW
Annual Energy Generation: 738.2 GWh
Substation: Nalgad Hub Substation (132 kV DC 34 km)