NEA Engineering Company (NEC) was awarded the contract for consulting services to carry out the Detailed Engineering and Environmental Study of Haitar – Sitalpati (Arun Corridor) 400 kV Transmission Line Project on 16th December, 2018.
Status Completed
Tags: Detailed Engineering Design, Environmental Study