आ.व २०८२्/०८३ सूची दर्ता गर्ने सम्वन्धि सूचना(Document link)
NEC has completed the survey and design of the transmission line using the advanced methods of investigations such as LIDAR and Drone survey.
Status Completed
Tags: Feasibility Study