The contract agreement was signed in March, 2018 between NEC and Upper Tamakoshi Hydropower Ltd. (UTKHPL) to conduct the Feasibility/Detail Engineering Study of RKHEP incorporating the technical, financial, and relevant aspects of the project development based on detailed survey and investigations. The study was completed in January 2021.
As per the Contract Agreement with UTKHPL, NEC has been providing the consulting services for the construction supervision of the project.
Location: Gaurishanker Rural Municipality-4, and Bigu Municipality-4 of Dolakha District
Type of Project: Run of River Scheme
Design Discharge: 11.8 m3/s
Gross Head: 207.18m
Installed Capacity: 20.66 MW
Annual Energy: 105 GWh
Evacuation Substation: Upper Tamakoshi Hydroelectric Project Substation at Gongar